ASERBAIDSCHAN
Task
Installation of a total of 21 Wind Measuring Masts at two sites in Aserbaidschan.
Challenge
The ground/soil conditions do not allow a conventional anchorage of the mast or anchoring wires.
Due to years of draft the soil of site A has been dried out, during storm the anchors lose their support.
On site B a high ground water level could lay bare the anchors.
Procedure
On site A the fastening points are excavated and finally the soil is exchanged.
On site B concrete foundations of more than 6 m³ guarantee a secure anchoring of mast center and bracing.