AUSTRIA
Task
Installation of 6 Wind Measuring Masts in total at a site in the foothills of the Alps of Austria.
Challenge
The dense woodlands only offer a small place to lay out the anchoring wires and hold dangers to become caught in small branches during installation.
Procedure
The anchoring wires will be laid out in a flexible way so that no tree has to be cut. The experience of our fitters guarantees a troublefree alignment.
With the help of a hydraulic winch the mast can be telescoped within 6 minutes (instead 30 with electric motor).
The reduced fluctuation of mast and ropes/wires minimises the danger to become caught in small branches.