CORSICA
Task
Installation of 6 Wind Measuring Masts in total in a mountain region.
Challenge
The site is located in an undeveloped mountain region without a suitable road access.
The rocky soil/ground impedes a conventional anchoring of the mast or the anchoring wires.
Procedure
The delivery of the total material including the tools will be carried out by helicopter.
For every anchoring a special dowel of 70 cm length will be used. The dowel will be driven into the mountain and filled up with a special injection glue. This guarantees a long-term and safe fastening.